PAYMENTS OF WORKS

2002 Agustus

 

 

 

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20020831

-384.500

-384.500

CW208

Benang, Kayu, Paku, Tali

 

 

 

 

 

2002 September

 

 

 

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20020901

-5.067.000

-5.451.500

CW208

Besi, Kawat, Gergaji, Balok

20020904

-5.511.500

-10.963.000

CW208

Triplex, Usuk, Paku

20020905

15.000.000

4.037.000

 

Terima Dana Thp II ke-33

 

-378.000

3.659.000

CW208

Besi 12 tes 14 lonjor

20020910

-1.647.000

2.012.000

CW208

Usuk, Besi, Paku, Empreng dl

20020911

-910.000

1.102.000

CW208

Triplex, Usuk, Paku, papan

 

-640.000

462.000

CW208

Pasir, Koral

20020912

-1.208.000

-746.000

CW208

Bayar tenaga kerja & angkut

20020913

-76.000

-822.000

CW208

Pipa 4 inch 2 batang

 

5.000.000

4.178.000

 

Terima Dana Thp II ke-35

20020914

-3.120.000

1.058.000

CW208

Bayar tenaga borongan galian

20020915

-360.000

698.000

CW208

Batu Koral 12 m3

20020916

-1.560.000

-862.000

CW208

Batu Koral, Pasir & Semen

20020917

-500.000

-1.362.000

CW208

Angkut pasir, koral, semen

20020918

-567.000

-1.929.000

CW208

Pasir, Koral, Kawat & benang

20020920

-320.000

-2.249.000

CW208

Angkut pasir 3 truk,koral 1 truk

20020921

5.000.000

2.751.000

CW208

Terima Dana Thp II ke-36

20020923

-120.000

2.631.000

CW208

Kajimas papan & paku

20020924

-1.362.000

1.269.000

CW208

Bayar tenaga tukang & kernet

20020925

-870.000

399.000

CW208

30 zak semen Gersik

20020926

-489.000

-90.000

CW208

Beli pipa, T, L, Lem 4 inch

20020928

-140.000

-230.000

CW208

Angkut Koral

 

5.000.000

4.770.000

 

Terima Dana Thp II ke-37

 

-49.000

4.721.000

CW208

Kawat Besi 7 kg

20020929

-55.000

4.666.000

CW208

pipa 3", dop 3"(2) & dop 4"(2)

20020930

-260.000

4.406.000

CW208

Koral cor 1 truk & pasir 1 truk

 

 

 

 

 

2002 October

 

 

 

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20021001

-895.500

3.510.500

CW208

Angkut Kerikil dan Pasir

20021003

-1.786.500

1.724.000

CW208

Bayar tenaga tukang & kernet

20021004

-310.000

1.414.000

CW208

Pasir & gergaji besi

20021005

-1.296.000

118.000

CW208

Semen, pipa, kuas, tenaga kj

20021006

5.000.000

5.118.000

 

Terima Dana Thp II ke-38

20021008

-1.340.000

3.778.000

CW208

Pasir, Koral halus, ember

20021009

-513.000

3.265.000

CW208

4 " Pipa, dop, lem, semen

20021010

-4.577.000

-1.312.000

CW208

Semen, pipa, lem, tenaga kj

20021011

-765.500

-2.077.500

CW208

Pipa, gergaji, lem, tanaman

20021012

-929.000

-3.006.500

CW208

Semen & bayar tenaga kerja

 

5.000.000

1.993.500

 

Terima Dana Thp II ke-39

20021013

-3.580.000

-1.586.500

CW208

Bayar tenaga, bahan, kerikil

20021014

-320.000

-1.906.500

CW208

Angkut Kerikil 8 m3

20021015

-122.500

-2.029.000

CW208

Pipa,gergaji,lem,ongkostanam

20021016

-80.000

-2.109.000

CW208

Angkut kerikil 8 org harian

20021018

-250.000

-2.359.000

CW208

Bayar tenaga tukang & kernet

20021020

-50.000

-2.409.000

CW208

Adibon Pengeras Beton

20021022

3.000.000

591.000

 

Terima Dana Thp II ke-40

20021026

5.000.000

5.591.000

 

Terima Dana Thp II ke-42

20021029

-30.000

5.561.000

CW208

Bayar tenaga tukang

20021031

-245.000

5.316.000

CW208

Taiwan putih dan pupuk

2002 November

 

 

 

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20021101

1.400.000

6.716.000

MC201

Terima dana dari Emerald ke-43

 

-1.400.000

5.316.000

MC201

Bayar tenaga Taman Tirta Gg

 

-1.120.000

4.196.000

CW208

Bayar 8 truk kerikil split jagung

20021102

-640.000

3.556.000

CW208

Bayar angkut kerikil angkul2

20021103

5.000.000

8.556.000

CW208

Teima dana Kak Surya ke-44

20021104

-25.000

8.531.000

CW208

Beli Nepel 3x3 selang pompa

20021105

-30.000

8.501.000

CW208

Bayar sewa listrik 1 hari pomp

 

-7.000

8.494.000

CW208

Beli Solar untuk disel pompa

20021106

-54.000

8.440.000

CW208

Rangka besi kolom 4 m 3 btg

20021107

-404.000

8.036.000

CW208

Solar, batako, paku, gergaji

20021108

-75.000

7.961.000

CW208

Ongkos angkut batako

20021109

-50.000

7.911.000

CW208

paku 3, 7, 10 cm

20021110

-16.000

7.895.000

CW208

4 mm besi 8 batang

20021111

-35.000

7.860.000

CW208

Bayar listrik 1 hari pompa

 

-2.080.000

5.780.000

CW208

Besi 10 tes 70; 8 tes 40; gergj

20021112

-1.908.500

3.871.500

CW208

Bayar tenaga tukang, pasir,dll

20021113

-7.500

3.864.000

CW208

Bensin Premium 4.29 liter

20021118

-1.857.500

2.006.500

CW208

Gali tanah & tenaga kerja

20021121

5.000.000

7.006.500

 

Terima dana dari Surya ke-46

20021122

-502.500

6.504.000

CW208

Pipa 4", besi 10 tes 20, lem

20021123

-1.636.000

4.868.000

CW208

Bensin Premium 5 liter

20021125

-691.500

4.176.500

CW208

Pipa,besi,ongkos,bensin dll

20021127

-75.000

4.101.500

CW208

Pipa 2" 3 lonjor

20021128

-2.116.000

1.985.500

CW208

Semen, Bayar tukang & gali

2002 December

 

 

 

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20021201

-1.400.000

585.500

MC201

Bayar tenaga Taman TirtaGg-2

 

1.400.000

1.985.500

MC201

Terima dana Emerald ke-48

20021202

-1.035.000

950.500

CW208

Bensin, pipa, paku, usuk

20021204

5.000.000

5.950.500

 

Terima dana dari Surya ke-49

 

-1.015.000

4.935.500

CW208

Pelunasan gali tanah & pasir

20021205

-2.238.500

2.697.000

CW208

Semen 39 zak, pasir, pipa dll

20021206

-160.000

2.537.000

CW208

Angkut pasir 2 truk angkul-tm

20021207

-15.000

2.522.000

CW208

Bensin preimum 8.6 liter

20021209

-1.300.000

1.222.000

CW208

Bayar tenaga tukang & kernet

20021210

-825.000

397.000

CW208

Bensin 8.6 lte & Semen 30 zk

20021211

-825.500

-428.500

CW208

Semen Tiga Roda & parkir

20021212

-587.500

-1.016.000

CW208

Semen Gersik 10 & Molen

20021213

-252.500

-1.268.500

CW208

Bensin,pipa,pasir,angkut psr

20021214

5.000.000

3.731.500

 

Terima dana Surya ke-50

20021215

-25.000

3.706.500

CW208

Bayar tenaga angkut pasir

 

-550.000

3.156.500

CW208

Semen Tiga Roda 20 zak

20021216

-558.000

2.598.500

CW208

Mesran , pipa, lem pipa

20021218

-1.380.000

1.218.500

CW208

Pasir 2 truk, semen 40 zak

20021219

-2.000.000

-781.500

CW208

Bayar tenaga tukang & kernet

 

-270.000

-1.051.500

CW208

Usuk kajimas 4x6x4 20 btg

20021220

-160.000

-1.211.500

CW208

Angkut pasir 2 truk angkul-tm

 

-405.000

-1.616.500

CW208

Semen tiga Roda 15 sak

20021221

-150.000

-1.766.500

CW208

Batako 200 bidang

20021222

5.000.000

3.233.500

 

Terima dana Surya ke-53

20021223

-855.000

2.378.500

CW208

Semen 30 zak & angkut bata

20021226

-455.000

1.923.500

CW208

Pipa, semen 15, kawat sidi

20021228

-220.000

1.703.500

CW208

Pasir 1 truk; angkut pasir

20021230

-2.372.000

-668.500

CW208

Bayar tenaga, pipa, semen 10

2003 January

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20030101

1.400.000

731.500

MC201

Terima dana Emerald ke-54

 

-1.400.000

-668.500

MC201

Bayar tenaga Taman TirtaGg-3

20030102

-437.500

-1.106.000

CW208

Semen 15, lem pipa, T 4" pipa

20030103

-5.000

-1.111.000

CW208

Paku 7 cm 1 kilogram

20030105

5.000.000

3.889.000

 

Terima dana Surya ke-55

20030106

-580.000

3.309.000

CW208

Lotus, semen, paku, pasir

20030109

-1.378.000

1.931.000

CW208

Bayar tenaga Tukang/kernet

20030111

5.000.000

6.931.000

 

Terima dana Surya ke-56

20031113

-10.000

6.921.000

CW208

Baut 20 biji

20030114

-940.000

5.981.000

CW208

Kerikil 4 trk, Bensin, Angkut

20030120

-671.000

5.310.000

 

Bayar tenaga Tukang/kernet

20030123

-356.000

4.954.000

CW208

Kerikil 1 trk, Angkut & oli

20030127

-2.000.000

2.954.000

CW206

Tanda Jadi 4 patung Naga

20030130

-432.000

2.522.000

 

Bayar tenaga Tukang/kernet

 

-1.000.000

1.522.000

CW208

Kerikil split 4 truk

20030131

-320.000

1.202.000

CW208

Angkut kerikil split 4 truk

2003 February

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20030203

-1.400.000

-198.000

MC201

Bayar tenaga Taman TirtaGg-4

20030204

-39.600

-237.600

Miscellaneous

Internet Tirta gangga & disket

20030209

1.400.000

1.162.400

 

Terima dana Surya ke-60

20030215

4.000.000

5.162.400

 

Terima dana Surya ke-61

2003 March

20030303

-1.400.000

3.762.400

MC201

Bayar tenaga Taman TirtaGg-5

20030307

-320.000

3.442.400

CW208

Angkut kerikil split 4 truk

20030308

-1.000.000

2.442.400

CW208

4 truk kerikil / koral

20030309

-20.000

2.422.400

 

Bensin premium

20030314

-980.000

1.442.400

CW206

Semen, paku, usuk, kawat

20030315

-1.586.000

-143.600

CW206

Besi 16, 10, 4 tes begisting

20030316

-96.000

-239.600

CW206

Bambu 4 btg, reng 1 ikat

 

3.000.000

2.760.400

 

Terima Dana ke-64 Surya

 

-600.000

2.160.400

CW206

Pasir super 4 truk

20030317

-95.000

2.065.400

CW206

reng kamper 1 ikat

20030318

-320.000

1.745.400

CW206

Angkut pasir 4 truk

20030319

-550.000

1.195.400

CW206

Semen Tonase 20 zak

20030320

-80.000

1.115.400

CW206

Angkut kerikil & batu kali 1 trk

 

-250.000

865.400

CW206

Pasir urug & batu kali 1 truk

 

-160.000

705.400

CW206

Angkut batu kali & pasir urug

20030321

-80.000

625.400

CW206

Paku 7, 3, kawat tali

20030322

-600.000

25.400

CW206

Bata merah 2000 bata

20030323

5.000.000

5.025.400

 

Terima Dana ke-65 Surya

 

-50.000

4.975.400

CW206

Angkut Bata 2000 dari angkul

 

-18.000

4.957.400

CW206

Ember 6 plastik

20030324

-1.361.000

3.596.400

CW206

Usuk, triplex, betel, gergaji dll

20030325

-1.135.000

2.461.400

CW206

Bayar tenaga kerja 16-25 Mar

 

-550.000

1.911.400

CW206

Semen Tonase 20 zak

20030327

-75.000

1.836.400

CW208

Ongkos tanam tanaman wwg

 

-1.045.000

791.400

CW206

Besi 16, 10, Triplex 9 mm

20030328

-920.000

-128.600

CW206

Bayar tenaga angkut, & pasir

20030329

3.400.000

3.271.400

 

Terima Dana ke-66 Surya

 

-3.708.000

-436.600

CW208

Beli tanaman WWG

20030330

-562.000

-998.600

CW206

Semen 20 zak, paku 7, 2 kg

 

-50.000

-1.048.600

CW208

Dop 4" 10 batang

20020331

-1.400.000

-2.448.600

MC201

Bayar tenaga Taman TirtaGg-6

2003 April

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20030401

7.000.000

4.551.400

 

Terima Dana ke-68 Surya

20030403

-1.177.500

3.373.900

 

Bayar tenaga kerja 26/03-4/04

 

3.000.000

6.373.900

CW208

Terima Dana ke-69 Emerald S

20030407

-3.000.000

3.373.900

CW204

Tanda jadi 50% pagar besi

 

-25.000

3.348.900

CW206

Palu 2 ; Betel 2

20030408

-67.500

3.281.400

 

Bensin premium 37,29 liter

20030411

-550.000

2.731.400

CW206

Semen Tiga Roda 20 zak

 

-44.000

2.687.400

CW206

Pipa 3/4" 2 lonjor & L3/4" 12

20030412

-1.403.500

1.283.900

 

Bayar tenaga kerja 4/4-12/04

20030413

3.000.000

4.283.900

 

Terima Dana ke-71 Surya

20030414

-696.000

3.587.900

CW206

SemenTonasa 25 zak

20030415

-1.054.000

2.533.900

CW206

31 Lockster keramik

20030418

-1.230.000

1.303.900

CW206

Semen 20 zak & Pasir 3 truk

20030420

-160.000

1.143.900

CW206

Bata Merah 500 bata

20030421

-18.000

1.125.900

CW206

Besi 8 K 2 batang

 

-1.684.000

-558.100

 

Bayar tengakeja 13/4-21/4'03

20030424

-69.500

-627.600

 

Bensin premium 38,2 literPark

20030425

5.000.000

4.372.400

 

Terima Dana ke-72 Surya

20030426

-100.000

4.272.400

CW206

Bayar Naga untuk beli bahan

20030427

-145.000

4.127.400

CW206

Kawat sidi, kawat burung,paku

20030429

-405.000

3.722.400

CW206

Bata semen besi kawat sidi

20030430

-1.906.500

1.815.900

 

Bayar tengakeja 22/4-30/4'03

 

-747.000

1.068.900

CW206

Besi, Kawat, semen, Bata

 

-16.000

1.052.900

CW208

Pupuk NPK 2 buingkus

 

-460.000

592.900

CW206

Pasir 2 truk dan angkut ke Tm

2003 May

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20030501

-1.400.000

-807.100

MC201

Bayar karyawan Tirtagangga-7

 

5.000.000

4.192.900

 

Terima Dana ke-73 Surya

20030502

-1.810.000

2.382.900

CW206

Pelunasan Naga pd jembatan

 

-1.500.000

882.900

CW204

Bayar termin ke-2 pagar besi

 

-8.000

874.900

CW206

Sidi tepung plastik 4 bidang

 

-405.000

469.900

CW206

Semen Kujang 15 zak

 

-500

469.400

 

Parkir mobil depan BNI

20030503

-70.000

399.400

 

Bensin premium

 

-7.500

391.900

CW206

Kertas Karton 10 lbr

 

-419.000

-27.100

CW204

Bata, reng, besi, kawat, beng

 

5.000.000

4.972.900

 

Terima Dana ke-74 Surya

20030504

-2.100.000

2.872.900

CW204

Pelunasan Pagar Besi 30 bid

 

-46.000

2.826.900

CW204

Betel 2, gergaji besi 4

20030505

-620.000

2.206.900

CW204

Palu 2 btg, 6 Boma Cetakan

20030506

-300.000

1.906.900

CW204

Pasir 2 truk (super)

 

-160.000

1.746.900

CW204

Angkut pasir dari angkul

 

0

1.746.900

CW206

Pot Segi-4 utk jembatan Ngur

20030507

-1.497.000

249.900

 

Bayar tengakeja 1/5-6/5'03

20030508

-50.000

199.900

 

Bensin premium

20030509

-150.000

49.900

CW206

Semen Tns 5 zak,Hitam & put

20030510

-20.000

29.900

 

Bensin premium

20030511

5.000.000

5.029.900

 

Terima Dana ke-75 Surya

 

-409.000

4.620.900

CW206

Semen 15 zak, kuas 1" & 2"

20030512

-63.500

4.557.400

CW204

Hamer halus, djarum 126, pltr

20030513

-162.000

4.395.400

CW208

Pipa 4" 2 ljr, Dop 4", T 4", L 4"

20030514

-2.012.500

2.382.900

 

Bayar tengakeja 7/5-14/5'03

 

-186.500

2.196.400

CW208

Pipa 4" 2 ljr, 2" 2ljr, L 4", lem

 

-35.000

2.161.400

CW204

Hamer halus,

20030516

-30.500

2.130.900

CW206

Semen Index hitam 3, karton

20030519

-440.000

1.690.900

CW204

Semen Tiga Roda 15 zak Meil

 

-500.000

1.190.900

CW206

Boma, lis, kapu-kapu,ornamen

 

-840.000

350.900

 

Alokasi dana ke Tahap III

20030520

5.000.000

5.350.900

 

Terima Dana ke-76 Surya

20030522

-30.000

5.320.900

 

Bensin premium

 

-300.000

5.020.900

CW204

Bata merah pasang 1000

 

-275.000

4.745.900

CW206

Semen Index hitam 50 bgks

20030523

-2.337.000

2.408.900

 

Bayar tengakeja 15/5-23/5'03

20030524

-1.034.000

1.374.900

 

Alokasi dana ke Tahap III

 

-50.000

1.324.900

 

Bensin premium

20030525

-15.000

1.309.900

CW204

Baut "12" 30 btg

20030526

-415.000

894.900

 

Alokasi dana ke Tahap III

 

-20.000

874.900

 

Bensin premium

20030527

-250.000

624.900

CW206

Semen Index 1 krg & gergaji

 

-320.000

304.900

 

Alokasi dana ke Tahap III

20030528

5.000.000

5.304.900

 

Terima Dana ke-77 Surya

 

-16.000

5.288.900

CW206

Kuas 4", 3", 2" inch

20030529

-2.200.000

3.088.900

CW204

Bayar pagar Bug-Bug 10 bid

 

-500.000

2.588.900

 

Alokasi dana ke Tahap III

2003 June

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20030602

-1.200.000

1.388.900

 

Alokasi dana ke Tahap III

 

-1.400.000

-11.100

MC201

Bayar karyawan Tirtagangga-8

 

5.000.000

4.988.900

 

Terima Dana ke-78 Surya

20030603

-2.316.500

2.672.400

 

Alokasi dana ke Tahap III

 

-2.200.000

472.400

CW204

Bayar pagar Bug-Bug 10 bid

20030604

-50.000

422.400

 

Bensin premium

20030606

5.000.000

5.422.400

 

Terima Dana ke-79 Surya

 

-1.125.000

4.297.400

 

Alokasi dana ke Tahap III

20030607

-3.590.500

706.900

 

Bayar tengakeja 24/5-6/6-'03

20030608

-60.000

646.900

CW206

4 bidang cetakan wayang

 

20030609

-90.000

556.900

TAHAP III

Alokasi dana ke Tahap III

 

20030610

-282.500

274.400

CW206

Tegel jembatan + Transport

 

20030611

-135.500

138.900

CW206

Pipa 1",1/2",Sok, semen dll

 

20030612

5.000.000

5.138.900

 

Terima Dana ke-80 Surya

 

20030613

-94.500

5.044.400

 

Bayar tenaga kernet 7-12 Juni

 

 

-2.629.500

2.414.900

 

Alokasi dana ke Tahap III

 

 

-75.000

2.339.900

 

Oli mesran 4 liter, Cuci 1 kend

 

20030614

-1.543.000

796.900

 

Bayar tengakeja 7/6-14/6-'03

 

 

-240.000

556.900

CW208

Penutup resapan bak kontrol

 

20030616

-500.000

56.900

TAHAP III

Alokasi dana ke Tahap III

 

20030620

-17.500

39.400

TAHAP III

Alokasi dana ke Tahap III

 

20030622

5.000.000

5.039.400

 

Terima Dana ke-81 Surya

 

 

-577.000

4.462.400

TAHAP III

Alokasi dana ke Tahap III

 

20030623

-60.000

4.402.400

TAHAP III

Alokasi dana ke Tahap III

 

20030625

-1.527.500

2.874.900

 

Bayar tengakeja 20/6-25/6-'03

 

 

-21.000

2.853.900

CW204

Baut untuk pagar besi kolam

 

 

-2.590.500

263.400

TAHAP III

Alokasi dana ke Tahap III

 

 

-100.000

163.400

 

Kartu Simpati 100.000

 

20030626

-9.000

154.400

CW208

Penutup resapan bak kontrol

 

 

 

 

 

 

 

 

2003 July

 

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20030701

-50.000

104.400

CW204

Pipa 2” & L 2”

 

-8.000

96.400

 

Fotokopi undangan & amplop

20030702

5.000.000

5.096.400

 

Terima Dana ke-82 Surya

20030703

-1.400.000

3.696.400

MC201

Bayar karyawan Tirtagangga-9

 

-727.500

2.968.900

TAHAP III

Alokasi dana ke Tahap III

 

-275.000

2.693.900

TAHAP III

Alokasi dana ke Tahap III

20030704

-69.000

2.624.900

CW208

Pipa 4”, L 4”, sambung 4”,lem

20030705

-1.801.000

823.900

 

Bayar tengakeja 26/6-5/7-‘03

 

-85.000

738.900

CW208

Paku 5, 7 & gergaji savink

 

0

738.900

 

 

20030707

-75.000

663.900

 

Bensin premium

 

3.750.000

4.413.900

 

Terima Dana ke-83 Surya

20030708

-1.525.000

2.888.900

 

Alokasi dana ke Tahap III

20030709

-1.400.000

1.488.900

CD204

Mesin Potong rumput 1 unit

20030710

-1.500.000

-11.100

CW204

Pagar besi DP 40% 15 bidang

 

-200.000

-211.100

 

Alokasi dana ke Tahap III

20030713

5.000.000

4.788.900

 

Terima Dana ke-84 Surya

 

-1.520.000

3.268.900

Miscellaneous

Film 1 rol & prasmanan 60 org

 

-882.000

2.386.900

TAHAP III

Alokasi dana ke Tahap III

 

-1.095.000

1.291.900

TAHAP III

Alokasi dana ke Tahap III

20030717

5.000.000

6.291.900

 

Terima Dana ke-85 Surya

20030718

-232.000

6.059.900

 

Alokasi dana ke Tahap III

 

-300.000

5.759.900

 

Alokasi dana ke Tahap III

 

-2.770.500

2.989.400

 

Bayar tengakeja 7/7-18/7-‘03

 

-20.000

2.969.400

 

Bensin premium

 

-160.000

2.809.400

 

Alokasi dana ke Tahap III

20030719

-737.500

2.071.900

TAHAP III

Alokasi dana ke Tahap III

 

-7.500

2.064.400

GD204

Batu Pengikir potong rumput

20030720

-50.000

2.014.400

Miscellaneous

Bensin premium

20030722

-40.000

1.974.400

Miscellaneous

Bensin premium

20030725

-10.000

1.964.400

Miscellaneous

Fotokopi

 

-1.011.000

953.400

 

Bayar tengakeja 19/7-22/7-‘03

 

-815.500

137.900

TAHAP III

Alokasi dana ke Tahap III

20030728

5.000.000

5.137.900

 

Terima Dana ke-86 Surya

 

-534.500

4.603.400

TAHAP III

Alokasi dana ke Tahap III

20030729

-123.500

4.479.900

Miscellaneous

Senter jaga malam & buku

 

-74.000

4.405.900

Miscellaneous

Cat, Amplas, kuas, meil,lis dll

 

-699.000

3.706.900

TAHAP III

Alokasi dana ke Tahap III

20030730

-460.000

3.246.900

TAHAP III

Alokasi dana ke Tahap III

20030731

-1.120.000

2.126.900

CW208

Pacing Putih, Lotus Merah, dll

 

57.500

2.184.400

EMERALD

Beli pasir 1 m3 dari proyek

 

 

 

 

 

 

2003 August

 

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20030801

-1.400.000

784.400

MC201

Bayar karyawan Tirtagaga-10

 

-19.000

765.400

Miscellaneous

Lampu kapal, minyak, refree

20030802

-50.000

715.400

Miscellaneous

Bensin premium 27,6 liter

 

-81.000

634.400

Miscellaneous

Bambu 10 btg, besi 4 tes, dll

 

5.000.000

5.634.400

 

Terima Dana ke-87 Surya

 

-102.000

5.532.400

Miscellaneous

Triplex 6 mm, cat putih, tiner

20030804

-2.131.500

3.400.900

 

Bayar tengakeja 24/7-2/8-'03

 

-20.000

3.380.900

Miscellaneous

Bredel Rante 2 unit

 

-530.000

2.850.900

TAHAP III

Alokasi dana ke Tahap III

20030805

-52.500

2.798.400

TAHAP III

Alokasi dana ke Tahap III

20030806

-56.000

2.742.400

GD204

4 unit pemotong Arit

 

-15.000

2.727.400

TAHAP III

Alokasi dana ke Tahap III

20030807

-217.000

2.510.400

TAHAP III

Alokasi dana ke Tahap III

20030808

-41.000

2.469.400

TAHAP III

Alokasi dana ke Tahap III

20030809

-690.000

1.779.400

TAHAP III

Alokasi dana ke Tahap III

20030811

5.000.000

6.779.400

 

Terima Dana ke-88 Surya

 

-265.000

6.514.400

CW201

Lampu TL 40 W; Kabel 3 roll

 

-5.500

6.508.900

CW201

Isolasi hitam, cuk

 

-237.500

6.271.400

CW208

Pisang sorga, sempol putih dll

 

-1.125.000

5.146.400

TAHAP III

Alokasi dana ke Tahap III

20030812

-470.000

4.676.400

CW201

Kabel Ny Y2x1/2 3 rol, TL 40w

 

167.500

4.843.900

CW201

Tukar Tambah (kembali)

20030813

-36.000

4.807.900

CW201

Klem kabel 10 mm, isolasi

 

-42.500

4.765.400

CW201

Klem kabel 10 mm

20030814

-2.406.000

2.359.400

 

Bayar tengakeja 4/8-14/8-'03

 

-200.000

2.159.400

CW201

Lapu WD 40 W & 1 rol kabel

 

32.500

2.191.900

CW201

Tukar Tambah (kembali)

 

-1.768.250

423.650

TAHAP III

Alokasi dana ke Tahap III

20030815

-19.000

404.650

TAHAP III

Alokasi dana ke Tahap III

20030818

-80.000

324.650

CW201

Ongkos pasang lampu 4 titik

 

-101.000

223.650

TAHAP III

Alokasi dana ke Tahap III

20030819

-54.000

169.650

Miscellaneous

Bensin premium 25,36 liter

 

-29.000

140.650

TAHAP III

Alokasi dana ke Tahap III

 

5.000.000

5.140.650

 

Terima Dana ke-89 Surya

20030820

-29.000

5.111.650

CW201

Ongkos pasang lampu 1 titik

 

-690.000

4.421.650

CW211

Semen Tiga Roda 25 zak

 

-538.000

3.883.650

TAHAP III

Alokasi dana ke Tahap III

20030821

-460.000

3.423.650

CW211

Pasir 2 truk & ongkos angkut

20030822

-50.000

3.373.650

Miscellaneous

Bensin premium

 

-318.000

3.055.650

CW211

Usuk, reng, paku

 

-480.000

2.575.650

CW208

Palem Putri 3 batang

 

-1.820.000

755.650

 

Bayar tengakeja 15/8-22/8-'03

20030823

-706.000

49.650

CW211

Papan kjmas 20, usuk 10

 

3.500.000

3.549.650

 

Terima Dana ke-90 Surya

20030825

-1.800.000

1.749.650

CW204

Pagar besi Lunas 60% 15 bid

20030826

-75.000

1.674.650

CW204

Betel, sikat besi, cangkul

 

-560.000

1.114.650

CW211

Angkut puing & batu kali

20030827

-900.000

214.650

CW211

Batu kali 2 trk & pasir 4 trk

 

-540.000

-325.350

CW211

Semen Tiga Roda 20 zak

20030829

-40.000

-365.350

Miscellaneous

Bensin premium

20030830

-745.000

-1.110.350

CW211

Semen, Gergaji, Benang

20030831

7.500.000

6.389.650

 

Terima Dana ke-91 Surya

 

 

 

 

 

 

2003 September

 

Date

Receipt/

Cash

Work

Remarks

 

Expenditure

 

No.

 

 

(Rp)

(Rp)

 

 

20030901

-1.400.000

4.989.650

MC201

Bayar karyawan Tirtagaga-11

 

-480.000

4.509.650

CW211

Angkut pasir 4 truk, bt kali 2 tr

 

-380.000

4.129.650

CW211

Angkut puing bangunan

 

-50.000

4.079.650

Miscellaneous

Bensin premium

20030905

-1.981.000

2.098.650

 

Bayar tengakeja 23/8-2/9-'03

 

-685.000

1.413.650

CW211

Semen Tiga Roda & linggis

20030906

-1.405.000

8.650

TAHAP III

Alokasi dana ke Tahap III

20030908

-5.000

3.650

CW211

Palu - 1 batang

20030909

-300.000

-296.350

CW204

Bata merah 1000 biji

20030912

5.000.000

4.703.650

 

Terima Dana ke-92 Surya

20030913

-133.000

4.570.650

CW211

Angkut bata merah, terpal, dll

 

-25.500

4.545.150

CW201

Kepiting, lampu neon 2

 

-40.000

4.505.150

TAHAP III

Alokasi dana ke Tahap III

20030915

-2.182.000

2.323.150

 

Bayar tengakeja 2-15/9-'03

20030916

-413.000

1.910.150

CW211

Semen Tiga Roda & kawt sidi

20030917

-1.750.000

160.150

TAHAP III

Alokasi dana ke Tahap III

 

-210.000

-49.850

CW211

Angkut batu dan puing-puing

 

-491.000

-540.850

TAHAP III

Alokasi dana ke Tahap III

 

-12.000

-552.850

CW201

Baterei 6 batu utk senter